Product Details:
|
Rated Power Output: | 15W | Line Input: | 100V Or 70V |
---|---|---|---|
Sampling Rate: | 8K~48K | S/N Ratio: | ≧85dB |
High Light: | IP POE Wall Mount Speaker,Waterproof Wall Mount Speaker |
IP POE Wall Mount Speaker Public Address System Waterproof Black
Feature:
Specification:
Model | FIP-310P |
Description | IP POE Wall Mount Speaker |
Power Output (1KHz@-3dB) | 10 Watts/15W Watts |
Built-in Amplifier | 15W Watts |
Speaker Unit | 5” woofer+1.5” tweeter |
Network I/F | 10/100Mbps |
Protocol | ARP, TCP/IP, UDP, ICMP & IGMP (Group Broadcast) |
Audio Format | MP3/MP2 |
Audio Quality | 16digit stereo CD level |
Sampling Rate | 8K~48K |
Bit Rate | 8K~512Kbps |
Sensitivity | 92dB/1W/1M |
S/N Ratio | ≧85dB |
THD | ≦0.1% |
Frequency Response | 100-18KHz(±3dB) |
Connector | One RJ45 port for existing LAN/WAN & internet One control input, 0V, short circuit contact One control output, 0V, short circuit contact One DC12V battery backup input |
Power Input | POE 802.3af or POE 802.3at & DC 12V |
Operation Temp | -30℃ to +55℃ |
Dimension | 257(W)×185(D)×170(H)mm |
Bracket | U-Shaped wall mount bracket |
Material | ABS cabinet and steel grille |
Weight | 2.5kg |
Company Introduction
Guangzhou FTD Audio Limited is a leading manufacturer of Public Address System and Conference System in China, We are focus on R&D and our Professional R&D team already 15 years’ experience on Audio field. FTD audio will offer the professional products and service to each of partner and do a win win business with our partners!
FAQ
1. Are you manufacturer?
Yes, we are public address system manufacturer located in Guangzhou, China.
Welcome to visit our factory.
2. Is sample order available? Is free sample available?
Firstly, sample order is available. Secondly, for new clients, we will return the sample fee after big order placed.
3. What's your warranty period?
Our warranty period is 12 months for speaker.
4. What's your payment terms?
We accept Western Union and TT. 30% deposit in advance, balance 70% before shipment.
5. Where is your main market?
Customers are mainly from Europe, Middle East and South Asia.
6. How many days do you need to prepare for the goods?
It takes 30 working days for large order.
Contact Person: Mr. Jack Tan